Expand photo
A self-contained classified space on your site
An outdoor hazardous location enclosure puts a C1D1 or C1D2 space in its own structure instead of inside an occupied building. AEL delivers it as a configured unit with ventilation, detection, controls and electrical coordinated to your classification and site.
Pictured: the interior of an AEL C1D1 container enclosure. Each project is configured to its own classification and site.
Construction is chosen to suit the project, including container-based and modular builds, and is confirmed with you during scoping.
Typical configurations and components
Components are selected per project, classification and climate. Not every enclosure includes every item shown.
Why put the hazard outside
Moving flammable gas and vapor work out of the main building can simplify how the rest of the facility is classified and reduce the hazardous area people pass through every day. A standalone enclosure can be set where the site plan, separation distances and the AHJ allow.
Outdoor units are built for weather, with HVAC and insulation options for heat or cold, and arrive as a configured package that can be relocated if the site changes. They suit fuel and energy testing, chemical or solvent processing, storage-adjacent work and remote or distributed sites.
Placement depends on property lines, nearby buildings, exits and utilities. AEL coordinates power, exhaust discharge, drainage and access with your site plan and the AHJ’s requirements.
Outdoor enclosures can include optional hazardous-location heaters and hazardous-location air conditioning, plus insulated, powder-coated walls, sized to your climate and the heat load of the process. Heating and cooling equipment is selected to suit the enclosure’s classification and is confirmed during engineering review.
Whether fire-resistance-rated construction is required for an outdoor hazardous location enclosure depends on the materials and quantities on site, the adopted building and fire codes (often the IBC and IFC), property-line and building separation, occupancy classification, and AHJ review—not on the electrical Class I / Division classification alone. Placing the process outdoors can change how indoor control-area fire-barrier rules apply, but fire-resistance options may still be specified for enclosure walls or site-separation goals. A construction hour option is not automatically a listed fire-rated assembly unless the project documents that basis. Outdoor enclosures can include optional fire-rated construction in 60-minute, 90-minute, and 2-, 3- or 4-hour configurations when selected for the project. A photograph of the enclosure does not establish a fire-hour construction or assembly rating; confirm the required construction for the project with your engineer and AHJ.
Your engineer and the authority having jurisdiction (AHJ) set the final area classification. AEL configures ventilation, gas detection, controls and electrical around that basis and can prepare documentation such as drawings, equipment schedules and ventilation information for review.
Class I covers flammable gases and vapors. Division 1 (C1D1) is where ignitable concentrations can exist during normal operation, or frequently because of repair, maintenance or leakage. Division 2 (C1D2) is where those materials are normally confined in closed containers or systems, or kept below ignitable levels by mechanical ventilation, so an ignitable atmosphere is expected only if containment or ventilation fails, or where the area borders a Division 1 space. AEL enclosures on this page are scoped for Class I, Division 1 or Division 2 projects.
Class II covers combustible dust. Division 1 (C2D1) is where dust can be suspended in the air in ignitable amounts during normal operation, or where electrically conductive dusts are present. Division 2 (C2D2) is where dust is not normally suspended, but layers or accumulations could ignite or be released during abnormal operation. Dust is a different hazard from gas and vapor, with its own equipment and design requirements, so dust-classified projects need a separate engineering review before scope is confirmed.
For more on the codes and room requirements, read C1D1 vs C1D2 requirements.
A Division 2 enclosure suits areas where flammable gases or vapors are normally contained or ventilated below ignitable levels; Division 1 applies where they can be present during normal operation or routine maintenance. Your engineer and the AHJ set the division, and equipment, ventilation and detection are configured to match.
Units are delivered as configured packages and set on a prepared surface. Delivery, crane or forklift handling and utility hookups are planned during scoping. For an indoor alternative, see indoor C1D1 and C1D2 rooms; solvent-extraction buyers can compare the Cube Series.
Brochure
Hazardous Location
Outdoor Hazardous Location Enclosures
Overview of AEL outdoor hazardous location enclosures.
Gallery
Get a quote
Let’s scope
your project.
Tell us about your application and timeline. Our team — not a call center — responds within one business day.
- Built in-house: fabrication, electrical, controls and suppression by our own team.
- Approved Stat-X distributor.
- Factory testing, documented as specified.
Financing available. Explore equipment financing and leasing options
- Talk to an engineer (888) 502-6695
- Location 1402 Airport Blvd, Santa Rosa, CA 95403
- Hours Mon – Fri, 8AM – 6PM PT
Request received.
Thank you. An AEL representative will review your request and reach out to you soon.
Your inquiry:
What happens next
- Engineering review. An AEL engineer reads your request and checks it against the right product line.
- We reach out within one business day. By email or phone, to confirm details, site conditions and timeline.
- Specs and pricing. You receive pricing and the key specifications for your configuration. Project drawings are prepared once an order is placed.
