AEL’s project-review sequence from requirements capture through design, fabrication, integration, and delivery.

What should an enclosure manufacturer review before fabrication?

The review should align the application, dimensions, equipment, site conditions, access, controls, ventilation, documentation, schedule, and installation approach. A clear input package reduces rework and gives the engineering and manufacturing teams a shared basis for the project.

Review the application: Contact

Get a quote

Let's scope
your project.

Tell us about your application and timeline. Our team — not a call center — responds within one business day.

  • Built in-house: fabrication, electrical, controls and suppression by our own team.
  • Approved Stat-X distributor.
  • Factory testing, documented as specified.
  • Talk to an engineer (888) 502-6695
  • Location 1402 Airport Blvd, Santa Rosa, CA 95403
  • Hours Mon – Fri, 8AM – 6PM PT

Fields marked are required. Everything else is optional.

Your details

We reply here. No newsletters.

For a quicker call-back.

Your project

A model, series or solution, e.g. Sentinel Mini 40.

Dimensions, site conditions, equipment, timeline: anything that helps us scope it.

An engineer, not a call center, replies within one business day. We never share your details.

Get a Quote

Discover more from AEL

Subscribe now to keep reading and get access to the full archive.

Continue reading