A clear comparison of two planning directions for teams balancing deployment, integration, and site constraints.

When should a project compare modular-frame and containerized data center enclosures?

Compare both directions when the project has defined equipment, deployment, access, thermal, electrical, and site requirements. A modular-frame approach can support a configured building system, while a containerized approach can support a rugged, repeatable enclosure format. The right direction depends on the project brief.

Review the application: Data Center Enclosures

Get a quote

Let's scope
your project.

Tell us about your application and timeline. Our team — not a call center — responds within one business day.

  • Built in-house: fabrication, electrical, controls and suppression by our own team.
  • Approved Stat-X distributor.
  • Factory testing, documented as specified.
  • Talk to an engineer (888) 502-6695
  • Location 1402 Airport Blvd, Santa Rosa, CA 95403
  • Hours Mon – Fri, 8AM – 6PM PT

Fields marked are required. Everything else is optional.

Your details

We reply here. No newsletters.

For a quicker call-back.

Your project

A model, series or solution, e.g. Sentinel Mini 40.

Dimensions, site conditions, equipment, timeline: anything that helps us scope it.

An engineer, not a call center, replies within one business day. We never share your details.

Get a Quote